This practical guide shows you how to complete a signed, QR-verified Lightning Protection System (LPS) & SPD Engineering Audit certificate in OhmCert Module #15 and how to troubleshoot non-compliant readings on site.
1. Step-by-Step OhmCert UI Workflow
- Open Module #15: Navigate to Lightning Protection System (LPS) & SPD Engineering Audit from the Dashboard.
- Load a 1-Click Standard Annex Preset: Open the blue Standard Annex banner at the top and click a preset (such as "LPS Class II Industrial / Data Center (40x25x12 m, Ring Earth)") to populate target limits automatically.
- Enter Your Field Measurements: Fill in the measured inputs (LPS Protection Level (IEC 62305-3), Structure Length L, Structure Width W, Structure Height H, Ground Flash Density Ng, Air-Termination Mast Height h above Roof, Installed Number of Down Conductors, Current Partitioning Factor kc (IEC 62305-3 Table C.1), Separation Insulation Material km (IEC 62305-3 Table 6), Length l along Down Conductor from Equipotential Bond, Actual Separation Distance s_actual to Metal/Cables, LPS Earth Termination Resistance R_A, Soil Resistivity rho (for IEC 62305-3 Fig. 2 l1 check), Down Conductor & Bonding Continuity, SPD Nameplate Voltage Protection Level Up, SPD Total Connecting Lead Length (L + PE)). Blank inputs stay neutral
PENDING. - Complete the 20-Point Checklist: Grade each item, attach photos if needed, and export the SHA-256 signed PDF certificate.
2. Worked Numerical Field Case Study
Scenario: LPS Class II Industrial / Data Center (40x25x12 m, Ring Earth) (IEC 62305 Class II) — LPL II (r=30m, 10x10m mesh, 10m down-conductor spacing, ki=0.06, kc=0.44, km=0.5 concrete)..
- LPS Protection Level (IEC 62305-3):
Class II - Structure Length L:
40 m - Structure Width W:
25 m - Structure Height H:
12 m - Ground Flash Density Ng:
2.5 1/km2/yr - Air-Termination Mast Height h above Roof:
3 m - Installed Number of Down Conductors:
14 - Current Partitioning Factor kc (IEC 62305-3 Table C.1):
3+ Down Conductors / Ring Earth (kc = 0.44) - Separation Insulation Material km (IEC 62305-3 Table 6):
Concrete / Brick / Masonry (km = 0.5) - Length l along Down Conductor from Equipotential Bond:
12 m - Actual Separation Distance s_actual to Metal/Cables:
0.85 m - LPS Earth Termination Resistance R_A:
4.2 Ohm - Soil Resistivity rho (for IEC 62305-3 Fig. 2 l1 check):
250 Ohm-m - Down Conductor & Bonding Continuity:
0.08 Ohm - SPD Nameplate Voltage Protection Level Up:
1.5 kV - SPD Total Connecting Lead Length (L + PE):
0.35 m
3. Engineering Troubleshooting: Corrective Actions When a Reading Fails
- Re-wire SPD connections using V-connection (Kelvin) layout or shorten L+PE lead total below 0.50 m so U_p/f stays <= 0.8 * U_w.
- Increase physical distance between LPS conductors and rooftop metal plant, or install additional down-conductors to lower the current-sharing factor k_c.
- Extend Type B ring earth electrode or add deep rods where RA > 10 Ohm or l_1 is below the IEC 62305-3 soil resistivity curve.
→ Try This Worked Example Live in Module #15 (Lightning Protection (LPS))