This practical guide shows you how to complete a signed, QR-verified EPO (Emergency Power Off) Functional Safety Checklist certificate in OhmCert Module #24 and how to troubleshoot non-compliant readings on site.

1. Step-by-Step OhmCert UI Workflow

  1. Open Module #24: Navigate to EPO (Emergency Power Off) Functional Safety Checklist from the Dashboard.
  2. Load a 1-Click Standard Annex Preset: Open the blue Standard Annex banner at the top and click a preset (such as "24 V DC Battery-Backed EPO System (4 Exits, 180 ms Trip)") to populate target limits automatically.
  3. Enter Your Field Measurements: Fill in the measured inputs (Measured De-energisation Time, Number of EPO Stations, Number of Principal Exit Doors, Shunt Trip Coil Voltage, Rated Coil Voltage, Interlock Loop Resistance). Blank inputs stay neutral PENDING.
  4. Complete the 13-Point Checklist: Grade each item, attach photos if needed, and export the SHA-256 signed PDF certificate.

2. Worked Numerical Field Case Study

Scenario: 24 V DC Battery-Backed EPO System (4 Exits, 180 ms Trip) (NEC 645.10 / IEC 60947-2) — Data hall EPO loop with 4 principal exits and 24 V DC supervised shunt trip supply..

  • Number of EPO Stations: 4
  • Number of Principal Exit Doors: 4
  • Measured De-energisation Time: 180 ms
  • Shunt Trip Coil Voltage: 24.2 V
  • Rated Coil Voltage: 24 V
  • Interlock Loop Resistance: 2.4 Ohm

3. Engineering Troubleshooting: Corrective Actions When a Reading Fails

  1. Install hinged, audible-alarmed protective covers over all EPO pushbuttons at exit doors.
  2. Replace corroded auxiliary contacts or undersized control wiring if EPO loop resistance exceeds 1.0 Ohm or coil voltage drops below 85%.
  3. Rewire reset logic so unlatching the EPO button only clears the lockout relay without closing upstream breakers.

→ Try This Worked Example Live in Module #24 (EPO Functional Safety)