#06Power Quality & Harmonics Survey Report
Multi-Asset / Multi-Point Equipment Schedule
Inspect multiple transformers, panels, rooms, motors, or RCDs in this module without overwriting previous assets. Each item receives a permanent QR Sticker UID preserved across annual audits.
Sticker UID: OC-POWE-C5F5Standard Limits, Equations & Space Presets
IEEE 519-2014 Table 1 (Voltage THD) & Table 2 (Current TDD by Isc/IL ratio), and EN 50160 grid quality limits for frequency, flicker Plt, and negative-sequence voltage unbalance.
Measured Inputs
Calculated / Evaluated Results
IEEE 519-2014 limits apply at the point of common coupling (PCC). The voltage THD limit follows the bus voltage level and the current limit is TDD (referred to maximum demand current IL), taken from Table 2 for the measured Isc/IL ratio.
Pending / Not tested — results stay neutral until valid measured values are entered.
- Pending
Voltage THD at PCC
- %
Not tested - enter the measured value. Acceptance: THDv <= 8.0% for <= 1.0 kV (LV - 8.0% IEEE 519 / EN 50160) [IEEE 519-2014 Table 1 / EN 50160 §4.2.5]
- Pending
Current Distortion TDD
- %
Not tested - enter the measured value. Acceptance: TDD <= 5% for Isc/IL < 20 [IEEE 519-2014 Table 2]
- Pending
Voltage Unbalance (Negative Sequence)
- %
Not tested - enter the measured value. Acceptance: Negative sequence unbalance <= 2% (10 min mean, 95% of week); <= 1% at motor terminals [EN 50160 §4.2.6 / NEMA MG-1 14.36]
- Pending
Long Term Flicker Severity Plt
-
Not tested - enter the measured value. Acceptance: Plt <= 1.0 for 95% of the week [EN 50160 §4.2.3 / IEC 61000-4-15]
- Pending
Displacement Power Factor (cos phi)
-
Not tested - enter the measured value. Acceptance: 0.95 <= DPF <= 1.00 (reactive penalty threshold) [Utility Grid Code / EPDK & IEC 60364-8-1]
- Pending
System Frequency Stability (vs 50 Hz Nominal)
-
Not tested - enter the measured value. Acceptance: 50 Hz +/- 1% (49.5 - 50.5 Hz) for 99.5% of year [EN 50160 §4.2.1]
Verification Checklist (0 / 14)
1Class A power quality analyser (IEC 61000-4-30 Class A) connected at Point of Common Coupling (PCC)
2Continuous 7-day logging period completed with 10-minute aggregation intervals per EN 50160 §4 / IEEE 519-2014
3Rogowski coils / CT clamps verified for correct arrow orientation, range selection, and L1-L2-L3 phase matching
4Voltage magnitude variations (+10% / -10% for 95% of week) and ITI/SEMI F47 voltage sag/swell events logged
5Voltage Total Harmonic Distortion (THDv) and individual harmonics up to 50th order evaluated against IEEE 519 Table 1
6Current Total Demand Distortion (TDD referred to peak demand IL and Isc/IL ratio) evaluated against IEEE 519 Table 2
7Triplen harmonics (3rd, 9th, 15th zero-sequence) and neutral conductor thermal loading assessed
8Short-term (Pst <= 1.0) and long-term (Plt <= 1.0) flicker severity verified per EN 50160 §4.2.3 / IEC 61000-4-15
9Negative-sequence voltage unbalance verified <= 2.0% at PCC (and <= 1.0% at 3-phase motor terminals per NEMA MG-1)
10Displacement Power Factor (cos phi) and True Power Factor (PF_true = P / S including harmonic distortion) compared
11Power factor correction capacitor banks inspected for series detuning reactors (e.g., 7% / 189 Hz) to prevent parallel resonance
12Active Harmonic Filter (AHF) or passive trap CT feedback loop and compensation capacity verified
13Upstream transformer K-factor / harmonic loss factor (FHL) derating margin reviewed
14Comprehensive PQ mitigation report (detuned banks, AHF sizing, phase balancing) issued and archived
General Notes
Free plan: 5 of 5 inspections / calculations left this month.