#01Earth Resistance & Equipotential Bonding Test Report
Multi-Asset / Multi-Point Equipment Schedule
Inspect multiple transformers, panels, rooms, motors, or RCDs in this module without overwriting previous assets. Each item receives a permanent QR Sticker UID preserved across annual audits.
Sticker UID: OC-EART-F153Standard Limits, Equations & Space Presets
Normative touch voltage limits (UL <= 50 V AC dry / <= 25 V AC wet & medical), seasonal electrode resistance ceilings, and IEEE Std 81 soil resistivity bands.
Measured Inputs
Calculated / Evaluated Results
Pending / Not tested — results stay neutral until valid measured values are entered.
- Pending
Max Permissible Electrode Resistance Ra_max = UL / Ia
- Ohm
Calculated for touch voltage limit UL = 50 V AC (50 V dry / 25 V wet-special locations).
- Pending
Calculated Touch Voltage U_touch = Ra x Ia
- V
Enter Ra and Ia to calculate fault touch voltage.
- Pending
Earth Electrode Resistance & Seasonal Stability (Ra)
-
Pending: enter measured earth electrode resistance Ra and device operating current Ia.
- Pending
Main / Supplementary Equipotential Bonding Continuity
-
IEC 60364-6 / BS 7671 GN3: Main protective bonding continuity <= 0.2 Ohm (<= 1.0 Ohm long supplementary runs).
- Pending
Wenner 4-Pole Soil Resistivity Classification (rho)
- Ohm-m
Not tested - <= 100 Ohm-m: Low resistivity soil - favourable for simple rod/strip earth electrodes. [IEEE Std 81]
Verification Checklist (0 / 14)
1Earth electrode, rod coupler, and conductor clamp free of galvanic corrosion and mechanically tight [IEC 60364-5-54 §542.3]
2Removable test link / disconnecting joint accessible for isolated electrode resistance testing [IEC 60364-5-54 §542.4]
3Main Earthing Terminal (MET) permanently labelled 'Safety Electrical Connection - Do Not Remove' [BS 7671 §514.13]
4Earthing conductor and main protective bonding cross-sections verified against IEC 60364-5-54 Table 54.2
5Main equipotential bonding connected to incoming metallic water, gas, fire-sprinkler, and HVAC services within 600 mm of entry
6Structural steelwork, foundation reinforcement, and metallic cable containment bonded to MET with continuous < 0.2 Ohm continuity
7Lightning Protection System (LPS) earth termination ring interconnected to MET via spark-gap or direct bond per design [IEC 62305-3]
8Wenner 4-pole soil resistivity (rho = 2*pi*a*R) and 61.8% Fall-of-Potential flat-slope plateau verified [IEEE Std 81 §8.2]
9Earth inspection pit cover intact, labelled with electrode ID, free of standing water, and backfilled properly
10Clamp-on / stakeless loop measurement cross-checked to rule out parallel metallic return paths inflating accuracy
11Test leads zeroed / nulled and potential/current spikes placed outside mutual resistance interference zones
12Seasonal moisture variation factor applied to measured RA against year-round worst-case dry soil conditions
13Touch and step voltage compliance verified (or equipotential grading mesh confirmed) around substation fence/perimeter [EN 50522]
14As-built earthing grid layout and historical degradation trend log updated in asset register